Specifications

22 Hardware Installation
2 Installation
Overview
Listed below are the steps performed for hardware installation. The actual
order of the steps depends upon the type of MSD, GC, and accessory ordered.
Unpacking and inspecting shipped materials
Installing the GC
Installing the MSD
Installing the computer and peripherals
Integrating the GC and MSD
Evaluating performance
Familiarizing the customer with the system
Installing CI MSD systems requires additional steps:
PFDTD calibrant added to calibration vial
Methane/isobutane gas purifier installation
Methane reagent gas line and gas purifier purge
Methane reagent gas line hookup
After system performance has been verified in EI mode, the MSD must be
switched to CI mode if applicable, and evaluated:
Chemical ionization (CI) ion source and CI interface tip seal installation
Bakeout and purge at least 2 hours
CI setup
Positive chemical ionization (PCI) autotune and sensitivity verification
Negative chemical ionization (NCI) autotune and sensitivity verification
High-mass autotune and sensitivity verification
The G3397A High Vacuum Gauge controller is required for CI operation.