Specifications

General Information 1
Hardware Installation 19
Before You Start
Verify that all the conditions specified in the 5975 Series MSD Site
Preparation Guide have been met:
Adequate space is available for the MSD system
Suitable supporting bench
Adequate electrical power is available at the correct voltages and
frequencies
Environmental control systems are adequate
Adequate preparations for safe exhaust venting
Supplies necessary for instrument operation are available, including
solvents, helium carrier gas, and methane reagent gas (for CI MSDs)
Computer supplies, including diskettes and printer paper
Conveniently located telephone
Lifting the GC and MSD will require the assistance of another person to
prevent injury.
Installation and verification will only be performed using helium carrier gas.
Product Weight, kg Weight, lb
5975 Series MSD
G3171A Standard turbo pump 39 85
G3172A Performance turbo pump 41 90
G3174A CI High Mass performance turbo
pump
46 100
6850 Series GC 23 51
6890 Series GC 50 110
7820A GC 50 110
7890A GC 50 110