Specifications

Table Of Contents
Chapter 1 Performance Tests
Agilent 53210A/53220A/53230A Operational Verification
Assembly-Level Service Guide 21
Agilent 53210A/53220A/53230A Operational
Verification
The operational verification consists of checks that may be performed at
any time to give a high degree of confidence that the instrument is
operating properly, without running the complete performance tests.
These checks represent the minimum set of tests recommended following
any option retrofit installations (Refer to Chapter 4).
If you are unfamiliar with the operation of the counter, you can review the
“Agilent 53210A/53220A/53230A Quick Start Tutorial.” However, the
procedures in this chapter are written so that little operational experience
is necessary. The procedures should be followed in the order in which they
appear.
Frequency Checks
1 Connect the counter’s rear-panel Int Ref Out as shown in Figure 1-
1 to the front panel Channel 1 input connector.
Figure 1-1. Operational Verification Setup for Agilent 53210A/220A/230A
Int Ref
Out
Ch 1