Specifications

Operating Checklist
Before returning your instrument to Keysight Technologies for service
or repair check the following items:
Is the instrument inoperative?
Verify that the ac power cord is connected to the instrument.
Verify that the front-panel On/Standby switch has been pushed.
Verify that the power-line fuse is installed and not open (see page 42).
The instrument is shipped from the factory with a 500 mAT,
250 V fuse. This is the correct fuse for all line voltages.
V
erify the power-line voltage setting.
See “If the Instrument Does Not Turn On” on page 42.
Does the instrument fail self-test?
Verify that the correct power-line voltage is selected.
See “If the Instrument Does Not Turn On” on page 42.
Remove all input connections to the instrument.
Errors may be induced by ac signals present on the input wiring
during a self-test. Long test leads can act as an antenna causing
pick-up of ac signals.
Is the Current measurement function inoperative?
Verify the input protection fuses on the 34901A Multiplexer Module.
If necessary, replace with a 1.5 A, 250 V NTD fuse.
Note: The Current input is only available on channels 21 and 22
of the 34901A module.
6
Chapter 6 Service
Operating Checklist
159