Specifications

Chapter 3 19
Operation
4294A Setting
7. Press PHASECOMP[-] key to start the phase compensation data measurement.
About 1 minutes later, phase compensation data measurement is completed and
the softkey label changes to PHASE COMP [DONE].
8. Connect the Lcur, Lpot, Hcur, Hpot terminal on the 16048G or 16048H to the
Lcur, Lpot, Hcur, Hpot terminal of the 100 Resistor respectively.
Figure 3-2 Connecting 100 Resister (Load Data Measurement)
9. Press
LOAD [-] key to start the load data measurement. When the load data
measurement is completed, the softkey label changes to LOAD [DONE].
10.Press done key.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com