Technical data
12 Chapter 1
Installation and Setup
Initial Inspection
Installation and Setup
Initial Inspection
Inspect the shipping container and the cushioning material for signs of
stress. Retain the shipping materials for future use, as you may wish to
ship the analyzer to another location or to Agilent Technologies for
service. Verify that the contents of the shipping container are complete.
The following table lists the items shipped with the analyzer.
Item Description
Accessories
AC/DC converter External power supply 15 VDC 130 W
Power Cable (See Table 1-2 on
page 29)
Connection for AC/DC converter power
source.
Stimulus /Response Calibration kit
Option SRK (pn N1996A-SRK)
includes:
Coax Accessories Case
Open/Short
Termination
This item is included ONLY when you have
ordered Option SRK.
Coax Accessories Case, plastic and foam
(5000-0912)
Open/Short, 50 ohm, N-type male
(85032-60011)
Termination, 50 ohm, N-type male (00909-60009)
Standard Documentation Set
Quick Started Guide Covers unpacking and setting up the
analyzer, analyzer features, and what to do
if you have a problem.
Documentation CD-ROM Includes electronic (PDF) versions of the
documents in the standard set (“Manual Set
on CD-ROM” on page 47). You can view and
print the information as needed. See the
CD-ROM jacket for installation
information.