Specifications
18
1280C GB 20001204
Switching the Classic E.O.S. on
1 Locate the main switch and place it in position ‘I’.
The processor starts an initialization procedure that may take 15 to 20 minutes.
2 The developer and fixer are heated or cooled. 
You can watch the progress of heating or cooling as the temperature indication
changes accordingly.
3 After a while, the following message indicates that the processor is ready for
operation:
❖
The actual temperature to be reached depends upon the setting for the actual pro-
cessing cycle. Refer to ‘Developer temperature’ on page 36.
Do not touch the switches with wet fingers!
During the initialization phase an emergency film can be processed if a film
is introduced on the feed table. Refer to ‘Processing an emergency film’ on
page 25.
cHDWLQJ
GHYHORSHU
or, e.g.:
53 d&
5($'<
53 d&










