Service manual
Section IV: On-Line Processor
Index I-3
Inserting the Replenishment Hoses 1-31
Installation Procedures
on-line processor 1-13
Installation Tools and Equipment
500 ml graduate 1-13
darkroom thermometer 1-13
digital voltmeter 1-13
level 1-13
Installing Filter Housing 1-30
Installing Level Sensors 1-31
Installing Overflow Tubes 1-30
Installing, Millipore Filter Cartridge 1-32
Internal Wiring Modifications 1-18
Inventory, OLP 1-3
J
J-hooks 3-28, 3-29
Job in Process
status message 4-25
Jog Function, OLP 2-3
Jumper Fuses 3-9
L
LCB 2-3, 4-3
LCB Inputs and Outputs
description 2-4
LCB Inputs and Outputs, Descriptions of 2-4
LCB Jumper Settings 4-5
LCB, Checking the Operation 4-3
Left Lower Door 1-6
Left Lower Door (Hinged) 1-25
Left Side Panel 1-20
Left Side Panel (Bottom) 1-24
Leg Adjustment Screw 1-23
Leg Cross-member (Stabilizing Brace) 1-6
Legs 1-6, 1-15
Legs and Feet, Attaching 1-13
Level Sensor 2-4
Level Sensors, Installing 1-31
Leveler Feet 1-14, 1-15
Leveler Feet, Rear 1-15
Leveling
front to back 1-20
side-to-side 1-20
Leveling the Processor 1-20
Lifting
cautionary measures 1-12
Lithium Battery 3-8
LMB 2-8, 4-7
LMB 180V DC 4-11
LMB, Calibrate 4-8
Load Engine Assembly on Dollies 1-12
Locations of Switches And Sensors 4-24
Locations of Wiring Connections 1-18
Low Level Mode 2-3
Lower Front Covers for Entrance Rack 1-6
Lower Platen of Entry Rack 1-21
Lower Rear Panel 1-20, 1-24
LPB 2-5, 2-6
LRB 3-10
LRB Board 3-11
LUTH Computer Board
functions 2-3
Luth Computer Board 2-3
LUTH Motor Board 2-8
description of inputs and outputs 2-8
functions 2-8
LUTH Motor Control Board 3-9, 4-7
LUTH Motor Control Board (LMB)
Calibration 4-7
LUTH Power Board 2-5
functions 2-6
Luth Power Board 2-6
LUTH Rectifier Board (LRB) 3-10
M
Main Drive Worm Gears 1-28
Main Motor 2-8
Main Power Input Terminals 2-6
Main Water Supply 1-16
MAN REPL key 2-10
Man Start key 2-3
Manual Replenishment 2-10
Manual Start
status message 4-25
Measuring from Floor to Platen (for Correct
OLP/Buffer Alignment 1-22
Middle and Rear Anti-oxidation Covers 1-33
Middle top cover 1-6
Millipore Filter Cartridge, Installing 1-32
Modes
idle 2-2
jog 2-2
low level 2-3
operate 2-2
ready 2-2, 2-3
standby 2-2
standby replenishment 2-2
topping-up 2-2
Motor
dryer blower 3-20
Motor Assembly, Dryer Blower 3-20
Motor Board (LMB) 4-10
Motor Overload
error message 4-25
O
OLP
specifications
physical A-1
OLP Boot-up Procedures 2-2
OLP Computer Boards
functions 2-3
OLP Covers and Panels 1-20
OLP Dimensions 1-2
OLP Electrical 1-2
OLP Electrical Specifications A-2
OLP Engine
preparing 1-8
unpacking 1-8