Service manual

1-1
Chapter 1:
OLP Installation
1.1 Introduction
This chapter provides information for unpacking, assembling and installing the
Avantra 36/44 On-Line Processor (OLP). Also described here are the electrical,
plumbing, and other physical requirements.
This chapter contains:
OLP Work Space Requirements
Space
Floor Load
Electrical
Operational
OLP Unpacking Procedures
Tools Required for OLP Unpacking
OLP Inventory
Opening and Unpacking the Parts Crate
Unpacking and Preparing the OLP Engine
Installation Procedures
Attaching the Legs and Feet
Connecting the Water Supply and Drainage
Connecting the Interface Cable
Connecting The Electrical Supply
Leveling and Attaching the OLP to the Buffer
Attaching the Panels and Covers