Installation guide
3.
Switch to the Web Services tab.
4. If the Report Sources Info field contains entries, double-click one of the entries.
or
If the Report Sources Info field is empty, click Add.
5. In the Report Source Provider field, type a name for the report source.
6. From the RIS type list, select the appropriate RIS type.
7. If you selected either Connectivity Manager Queryable RIS or Remote IMPAX RIS in the
previous step, in the URL field, enter the URL for the queryable RIS or the remote RIS.
8.
If Default Report Source is not selected, select it.
9.
To close the Edit Report Source dialog, click OK.
10.
Click Apply. Click OK.
Troubleshooting: Some sites may notice a delay in
updating clusters
(Topic number: 40944)
Issue
Cluster updates seem to take slightly longer in IMPAX 6.5.3 than they did in IMPAX 5.2 or 5.3.
Details
To boost performance at busy times, IMPAX introduces a small delay during which linked updates
between multi-cluster facilities are spooled. The spooled updates can then all be performed at the
same time.
If a cluster is not that busy, the 15-second delay during which updates are pooled is not ultimately
beneficial, and may result in slower rather than faster cluster updates.
Solution
If the system clocks are accurate on all IMPAX core systems, you can eliminate the 15-second delay
to achieve performance similar to what was available in IMPAX 5.2 and 5.3.You can do this through
a SQL update to the system database.
To remove the cluster update spooling delay
1. Launch CLUI.
2. Run the following command:
update MAP_INI set INI_VALUE = 0 where INI_SECTION = 'MVF_SCU' and INI_KEY =
'LINK_UPDATE_DELAY_TIME'
AS300 Upgrade Guide—IMPAX 5.2 or 5.3 to IMPAX 6.5.3 77
Agfa Company Confidential—Subject to Non-Disclosure Obligation