Installation guide

9.
Select each Transmit queue and click Halt Queue.
10.
To confirm that you want to halt the queue, click Yes.
Archiving remaining unarchived studies
(Topic number: 7742)
8.
Use the information from the latest report on archiving studies to identify remaining unarchived
studies (for details, refer to the appropriate version of the IMPAX Preparing to Upgrade Guide). You
must store these studies to the archive.
Verifying unverified studies
(Topic number: 60054)
1.
Before archiving studies, verify all unverified studies.
To verify unverified studies
1.
In Administration Tools, on the Daily tab, click Study Manager.
2.
From the location list, select Failed Verification.
3.
Set other search criteria to Any value.
4.
Click Refresh.
5. In the search results, select all studies.
6.
To fix up the studies that have failed HIS verification, click Fix All Studies.
7. Review the results presented in the dialog.
Storing unarchived studies
(Topic number: 58298)
2.
When no studies are returned by the Failed verification query, archive all remaining studies.
To store unarchived studies
1.
In the 6.2 or later Administration Tools, on the Daily tab, click Study Manager.
2.
From the location list, select Cached (or another value that will return the unarchived studies).
3.
Set other search criteria to Any value (or set to appropriate values).
4.
Click Refresh.
5. In the search results, select the studies to archive.
AS300 Upgrade and DAA Consolidation Guide—IMPAX 6.2 or 6.3 to IMPAX 6.5.3 19
Agfa Company Confidential—Subject to Non-Disclosure Obligation