Installation guide

Image area wizards
Hanging protocols
Comparative review modes
Teaching file folders
Key items that are not migrated include:
Worklists
Select wizards
Search and transmit locations
Tools and toolbar settings
Screen formats
Modality preferences
Window level presets
Permissions to teaching file folders
Markup for key images, only the original images retain the markup
Details are available in IMPAX 5.2 preferences migrated to IMPAX 6.5.3 (refer to page 118).
IMPAX upgrade period: IMPAX 5.2 or 5.3 upgrades
(Topic number: 10759)
During this phase, the IMPAX Server components are upgraded, the IMPAX database is migrated,
and the IMPAX Clients are upgraded. Some downtime usually occurs here; how long depends on
the site size, the type of backup done, and whether and how training and traveling servers are used.
For example, downtime can be anywhere from two to four days, and possibly spread over two
weekends.
IMPAX post-upgrade period
(Topic number: 10761)
This phase begins once all the Server components, the Application Server, and a critical mass of
Clients are running with the updated software and databases. During this phase, certain tests are
run and initial configuration tasks are performed. These activities may begin during the upgrade
weekend and continue for some days afterward.