User's Manual
99
2852 A EN 20070205
DRYSTAR AXYS
Performing the daily QC test for general
radiography applications (DT 2 B and DT 2 C)
Procedure
1 Turn on the Drystar AXYS and wait at least for 15 minutes. Refer to “Switching
on the Drystar AXYS” on page 48.
2 Press the Key-operator key to enter the Key-operator mode.
3 Press the down key seven times, followed by the ok key to select ‘QC’.
A confirmation screen appears:
4 Do one of the following:
•Press the Confirm key (YES) to start the QC procedure and proceed with step 5.
•Press the Escape key (NO) to quit.
5 Define the tray for printing.
The ‘Select tray’ screen appears:
WARNING: This test must be performed every day before any clinical film
can be processed.
5 Restore config.
6 Calibration
7 Service Actions
8 Quality Control
9 Installation
1.Upper tray
2.Lower tray










