Installation User Manual

Ag Leader Technology
Cable – Keypad, Radar, Switch
Ez-Guide Plus / 500 Installation Instructions
PN: 2005898 Rev A – June 2007 2
Enabling the implement switch in EZ-Guide Plus
From the run screen, arrow down to the config menu (wrench icon) and press OK.
Arrow down to the “Lightbar” menu and press OK.
Arrow down to “Display Config” and press OK.
Press OK until Path Display is highlighted. Arrow down until “Switch” is displayed
The EZ-Guide Plus will now log coverage area when the implement switch is
triggered.