Installation Guide
LED Indoor Luminaires 
Undercabinet  
120VAC, 50/60Hz  
Page 2 of 2                          8061394 R0 
Part #: VRAU09**, VRAU14**  
Part #: VRAU22**, VRAU32** 
Part #: VRAU40** 
Limited Factory Warranty 
This product is manufactured by AFX Inc. AFX Inc. hereby warrants that this fixture is free from defects in materials and workmanship when installed 
and used under normal operating conditions for a period of 7 years from date of purchase. This warranty covers all component parts and extends only to 
replacement of defective fixture or components; it does not cover failure due to improper installation, misuse, mishandling or damage incurred in transit. 
For questions, please call AFX 1-800-873-2326. 
Step 4 – Link to fixture installation 
A.  First fixture in series can be corded (step 2) or hardwired (step 3). 
B.  If using butt connector (9), additional fixtures must have a 1” gap between 
them. See below for number of fixtures that can be linked together. 
Model 
VRAU09** 
VRAU14** 
VRAU22** 
VRAU32** 
VRAU40** 
Adjacent Linking Qty. 
40 
25 
16 
11 
9 
C.  If using a linking cord, fixture must be located within desired length of linking 
cord being used: 12”, 24”, 36”, 48” or 72” for linking cords (sold separately). 
D.  Make sure power is off on all fixtures.  
E.  Connect the linking cord or butt connector (9) to the “OUTPUT” connector of 
the first fixture and into the “INPUT” connector of the second fixture 
F.  Follow the directions for mounting show in Step 6. 
G.  Once mounting is completed, energize the first fixture (Each fixture is controlled 
individually). 
Wiring – All wiring must take place inside junction box (not included) 
Caution: Make sure power is off at fuse or circuit breaker box. Check power 
wires for damage or scrapes. If power supply wires are within three inches of the LED 
driver, use wire suitable for at least 90°C (194°F). Note: Most dwellings built before 1985 
have supply wire rated to 60°C. Consult a qualified electrician to ensure correct branch 
circuit conductor before installing.  
Step 5 – Wiring 
A.  Pull the green, black, and white wires out of the fixture to allow connection to the branch 
circuit. 
B.  Connect the green ground input supply wire to the fixture green ground wire. Do this by 
inserting it into the open hole in the push-in wire connector (included) that is attached to the 
green ground wire in the fixture. 
C.  For non-dimming fixture. Connect the white wire from the fixture to the white (N) wire 
from supply power source. Do this by inserting it into the open hole of the push-in wire 
connector that is attached to the white wire in the fixture. Connect the black fixture wire to 
the black (L) wire from supply power source. Do this by inserting it into the open hole of the 
push-in wire connector that is attached to the black wire in the fixture. 
D.  For TRIAC dimming. Connect the white wire from the fixture to the white (N) wire from 
dimming source per dimmer wiring instructions. Do this by inserting it into the open hole of 
the push-in wire connector that is attached to the white wire in the fixture Connect the black 
wire from the fixture to the black (L) wire from dimmer supply power source per dimmer 
wiring instructions. Do this by inserting it into the open hole of the push-in wire connector 
that is attached to the black wire in the fixture. 
E.  Do not mix wires. Pull on each wire lead to make sure connections are secure. Make 
certain no bare wires are exposed outside of wire connectors. Tuck all connections 
neatly into the junction box. 
Step 6 – Mounting 
A.  Use captivated screw hole locations (6) for mounting the fixture, position the fixture in 
location intended for mounting. Mark the hole locations by using the screw-holes as a 
guide. Drill suitable pilot holes in the marked positions. Mount the housing to desired 
surface with the two captivated screws. 
Step 7 – Restore power at fuse or circuit breaker box 


