User manual

Table Of Contents
Section 2.3.5 Part B
04 APPROACH CREW CO-ORDINATION PROCEDURE LAND
Flight phase or event PF PNF
Down wind stabilized,
90 kts and gear down
Call: ‘LANDING CHECKLIST’
Perform
On final and landing
assured
Reduce speed to cross the
threshold with 70 kts
In the flare
Call: “PROPS FULL FINE”
Move
propellers full
fine
Established in
landing roll
KEEP NOSE OFF THE
GROUND AS LONG AS
POSSIBLE AND USE AS
AERODYNAMIC BRAKING
if needed apply brakes until speed is
reduced to taxi speed
Keep the aircraft straight with rudder
as long as possible
Assist
Runway vacated
Call: 'TAXI IN CHECKLIST'
Perform
In case downwind is extended, delay descent until intercepting 3° G/P.
1,5 nm
70 kts
Rev No: 01 Stichting Catalina PH-PBY
Page: 2 25 May, 2005
60 sec. every +/_ 100 ft higher is +/_ 10 sec
+/- 300 ft
3°glijpad
Start descent
20”/2050 RPM
90 kts, 300f
p
m
Abeam
+/- 1sec/kt
trackwind
Gear is
down