Step by Step Guide

A318/319/320/321
Profesional
Step-By-Step Tutorial
06-01- 104
11. Dezember 2018
If another waypoint is entered after the revise point = ALMER and before the F-PLAN DISCONTINUITY (in our
example = NERDU) and this waypoint is also part of the alternative company route then the flightplan collapses.
E. g. all waypoint of the alternate company route until this waypoint (= NERDU) are automatically deleted.
Temporary F-PLAN after matching with ALT RTE
Clear the F-PLAN DISCONTINUITY (LSK 3L) and insert this temporary flightplan (LSK 6R). The alternate flightplan
now becomes the active primary flightplan.
Primary F-PLAN
9.2 Alternate Destinations
If no ALT CO RTE is available (or we do not want to use it) we just work with ALTN destination.
Load the primary flightplan EDDFLOWG01
Enter “LOWW” into the MCDU INIT A page as ALTN = LSK 2R