Use and Care Manual

Drawer Installation
Pull slides in box to full extension. Align the slides in from the box
with the slides on the drawer one at a time. Once both are aligned,
push the drawer completely into the box.
01-999-2534 Page 7
Drawer Slide Removal
1. Remove the drawer.
2. Drill out rivets holding the slide on the box using a 5/32 inch drill
bit.
3. Push slide towards the back of the box to remove.
Drill out rivet
Drawer Slide Installation
1. Position the slide in approximately the same vertical position as
the previous slide was in.
2. Pull slide towards the front of the box.
3. Replace the rivet.
Cleaning or Replacing Media Pads
CAUTION: Disconnect all electrical power to the cooler
before attempting to install, open, or service your cooler.
The condition of your cooler pads should be checked
at least once a year; at the beginning of the season is
best. However, your pads may need to be checked more
frequently, depending on local air and water conditions. For
instance, in areas where mineral content of the water is high
or the air is dusty, deposits may build up in the cooler pads,
restricting airow. Clean or replace pads as follows:
1. Disconnect power from unit.
2. Remove pad frame assembly from cabinet.
3. Lay pad frame on smooth, at surface with pad retainer up.
observe the location / placement of the pad retainer.
Remove retainer by sliding it out from under the pad frame
ange. Carefully remove and discard old pad.
4. Using a mild detergent, wash dirt and scale from pad frame
and rinse with fresh water. Check slots at top of pad frame
to be sure they are open and clear. Wire brushing is not
recommended. If nish is damaged or rusting is noted,
repair area as noted in the “Touch-Up” section.
5. Place the slot in the end of the new pad over the bottom
ange of the pad frame and push the pad down against the
ange until it stops. Gently push the top of the pad into the
pad frame. Slide the 1” thick pad on top of the large pad
already in place. Replace the pad retainer by sliding the
retainer under the pad frame anges.
6. Pre-soak pad (this will help with the wetting of the pad on
start-up) .Reinstall pad frame assembly into unit.