User Manual Owner's manual

AM Series Boilers and Water Heaters
CHAPTER 3 INSTALLATION
OMM-0100_0B AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 Page 73 of 156
GF-146 Ph.: 800-526-0288 PRI - 07/14/14
3.16.5.14 Sidewall Termination Concentric Vent
A concentric vent termination must terminate outside the structure and must be installed as
shown in Figure 3-34. The termination opening must be protected from rain, see Figure 3-35.
Figure 3-34: Concentric Sidewall Termination Clearances
Figure 3-35: Concentric Sidewall Termination Clearances (Side View)