Instruction Manual

AM Series Cascade Sequencer
INSTALLATION AND OPERATION MANUAL
Wiring the Manager Heater Communications BoardContinued
9. Connect the yellow wire together with the two red wires present on terminal #17 (See
Figures 1-11 and 1-12).
Figure 1-11: Connecting Yellow Wire to Terminal #17
Figure 1-12: Terminal Wiring Diagram for Managing Heater
NOTE
Other wiring is not shown for diagram clarity.
Connect YELLOW Wire
To Terminal #17
Connect PINK Wire
To Terminal #16
Existing BLACK Wires
On Terminal #16
Existing RED Wires
On Terminal #17
OMM-0101_0A AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 Page 11 of 26
GF-146-CS Ph.: 800-526-0288 PRI - 11/25/14