Owners manual
4
g. With the factory intake system removed, begin re-
moving the factory charge plumbing by loosening the
clamp securing the cold-side charge hose to the throle
body using a 7mm socket.
h. Loosen the clamp holding the other end of the hose
to the intercooler. This may require reaching around the
frame rail to access the clamp with the 7mm socket.
Once loose, remove the factory cold-side charge hose.
i. Loosen the clamp securing the hot-side charge pipe
coupler to the turbo outlet with a 7mm socket.
j. Disconnect the wiring harness connected to the recir-
culaon valve.
e. Use a 7mm socket to loosen the hose clamp securing
the coupler to the turbo compressor inlet and remove
the coupler from the turbo.
f. Remove the factory intake assembly by liing out as
shown.