Technical data

Commissioning and Operation – Commissioning
5–2
YES!
NO!
YES!
commissioning
operation
assembly and installation work is
complete
switch on unit with smallest
vibration width
hammering noises?
Stopper-to-stopper
operation?
troubleshooting
see Chapter 6.2
turn the unit off!
maximum vibration width
set? (potentiometer fully
clockwise)
increase vibration
width!
check vibrator voltage and
current!
measurement values ok
according to Table 7.3?
turn the unit off!
compare to Table
7.3, AViTEQ
customer service
uniform and sufficient
throughput?
NO!
YES!
NO!
YES!
NO!
Figure 5.1 Commissioning procedure