User manual
INSTALLATION
20
INSTALLATION
Drilling the Ceiling/shelf and fixing the frame
• Useaplumblinetomarkthecentreofthehobontheceiling/supportshelf.
• Placethedrillingtemplate21 provided on the ceiling/support shelf, making sure that the tem-
plate is in the correct position by lining up the axes of the template with those of the hob.
• Markthecentresoftheholesinthetemplate.
• Drilltheholesatthepointsmarked:
• Forconcreteceilings,drillforplugsappropriatetothescrewsize.
• Forhollowbrickceilingswithwallthicknessof20mm:drillø10mm(immediatelyinsertthe
Dowels 11 supplied).
• Forwoodenbeamceilings,drillaccordingtothewoodscrewsused.
• Forwoodenshelf,drillø7mm.
• Forthepowersupplycablefeed,drillø10mm.
• Fortheairoutlet(DuctedVersion),drillaccordingtothediameteroftheexternalairexhaust
duct connection.
• Inserttwoscrewsofthefollowingtype,crossingthemandleaving4-5mmfromtheceiling:
• Forconcreteceilings,usetheappropriateplugsforthescrewsize(notprovided).
• forCavityceilingwithinnerspace,withwallthicknessofapprox.20mm,Screws12h, sup-
plied.
• Forwoodenbeamceilings,use4woodscrews(notprovided).
• Forwoodenshelf,use4screws12g with washers 22 and nuts 23, provided.