Operating instructions

7
Fig. 1 Control characteristic for U control 17
Fig. 2 Total set point 18
Fig. 3 Switch-on fault bridging 21
Fig. 4 Absolute value monitoring 22
Fig. 5 Relative monitoring 22
Fig. 6 Start screen LBA-2 27
Fig. 7 Main menu LBA-2 (sample) 28
Fig. 8 Example entries LOG file 29
Fig. 9 Access levels 30
Fig. 10 Language selection 33
Fig. 11 Folder selection 33
Fig. 12 Calendar navigation 33
Fig. 13 Calendar navigation with no LOG files found 33
Fig. 14 Standard zoom keys 34
Fig. 15 Y scaling panel 34
Fig. 16 Value panel 35
Fig. 17 Event panel details 35
Fig. 18 Example calendar 35
Fig. 19 Example for user interface Thyro-Tool Family 36
Fig. 20 Component mounting diagram control device 54
Fig. 21 Interfaces of Thyro-P 55
Fig. 22 Connection of a PC to Thyro-P via RS232 56
Fig. 23 X10 allocation 57
Fig. 24 Signal converter RS232 / fiber optic 58
Fig. 25 Schematic diagram fiber optic Thyro-P with LLV and PC 59
Fig. 26 Wiring of the dASM signal cables 62
Fig. 27 LEDs on the RJ45 connectors 62
Fig. 28 ASM wiring 68
Tab. 1 Behavior in case of load change 20
Tab. 2 Partial load breakdown with heating elements switched in parallel, undercurrent, relative monitoring 23
Tab. 3 Partial short-circuit with heating elements switched in series, overcurrent, relative monitoring 24
Tab. 4 Overview monitoring 25
Tab. 5 Error and data logger messages 39
Tab. 6 LBA-2 menu structure 40
Tab. 7 Terminal strip X1 45
Tab. 8 RESET 46
Tab. 9 Controller lock 46
Tab. 10 QUIT 47
Tab. 11 Current transformer 48
Tab. 12 Voltage transformer 50
Tab. 13 Voltage measurement jumper 50
Tab. 14 Terminal strip X2 for K1, K2, K3 51
Tab. 15 Terminal strip X5 in the control device 52
Tab. 16 Terminal strip X6 52
Tab. 17 Terminal strip X7 53
Tab. 18 Synchronization jumper 53
Tab. 19 Fiber optic distances 58
LIST OF ILLUSTRATIONS AND TABLES