Operating instructions

62
L1
L2, N
Unit 1 (M) Unit 2 Unit 3
X41 X40 X41 X40
Installation of the dASM control cables
With regards to the dASM procedure there are a few simple rules which need to be adhered to
when installing the control devices:
• For 1 and 3 phase loads separate dASM groups must be wired up.
• Power controllers and loads of a dASM group must be connected to the same grid in phase.
The connection of of the RJ45 patch cables (Ethernet CAT 5 8-pole) is made on the underside of
the control device in accordance with the following illustration to connectors X41 (output) and
X40 (input):
FIG. 26 WIRING OF THE dASM SIGNAL CABLES
The 4 LEDs on the RJ45 connectors serve to check the RJ45 wiring as well as that the dASM data
transmissions via the dASM control cables are running smoothly.
FIG. 27 LEDS ON THE RJ45 CONNECTORS
Installa
In Bezu
g
Steuerg
e
-
F
-
L
a
-
D
n
Abb.1V
e
Zur Übe
r
auf den
d
LED 1
Abb.2LE
D
tion der d
A
g
auf das dA
S
e
räte sind zu
F
ür 1- und 3
-
L
eistungsstel
a
ngeschloss
e
D
er Anschlus
n
achfolgend
e
e
rdrahtungde
r
r
prüfung so
w
d
ASM-Steue
r
LED
2
D
sandenRJ45
A
SM-Steuer
l
S
M Verfahre
n
beachten:
-
phasige Las
t
ler und Last
e
e
n werden.
s der RJ45-
P
e
n Abbildung
r
dASM Signall
e
w
ohl der RJ4
5
r
leitungen di
e
2
L
E
Buchsen
l
eitungen
n
sind ein pa
a
t
en sind getr
e
n einer dAS
M
P
atchkabel e
r
an den Buc
h
e
itungen
5
-Verdrahtun
e
nen die 4 L
E
E
D 3
a
r einfache
R
ennte dASM
-
M
-Gruppe m
ü
r
folgt an der
h
sen X41 (A
u
g als auch d
e
E
Ds an den
R
LED 4
R
egeln bei d
e
-
Gruppen zu
ü
ssen phase
n
Unterseite d
e
u
sgang) und
e
r fehlerfrei
l
R
J45 Buchse
n
e
r elektrische
verdrahten.
n
gleich am
g
e
s Steuerge
r
X40 (Eingan
l
aufenden d
A
n
.
n Installatio
n
g
leichen Netz
r
ätes gemäß
g):
A
SM-Datenü
b
n
der
der
b
ertragung