Operating instructions

35
3.2.7 VALUES DISPLAY
The values display panel can change the appearance of the diagram with regard to the value
sequences. By deactivating the checkboxes, the value sequences can be switched off and with the
help of color settings, the color of the values sequences (bar chart) can be changed.
By pressing the UP and DOWN buttons, the value times series can be displayed as a diagram in an
active drawing layer above or below the other times series.
During navigation the settings for the times series will not be deleted.
FIG. 16:
VALUE PANEL
3.2.8 EVENT REPORTS
Messages can be seen in combination with line chart data when recorded during Thyro-P operation.
By clicking on the SHOW EVENTS button, the event panel will be displayed. If an error, a warning,
or information event is selected on this panel, it will appear in the diagram as a colored area. The
slider will return to the start of the Event.
If the event does not lie within the zoomed section, the displayed section will be moved accordin-
gly.
Only one event will be displayed at a time in the diagram. If the event panel is closed, the currently
displayed event will also be closed.
3.2.9 PDF EXPORT
By clicking on the EXPORT TO PDF button, the current-status diagram, together with a legend of
the time series, will be saved in a PDF file.
3.2.10 EXAMPLE
TASK
For all production days in September 2013 process data have to be checked for thyristor current
supply of the 10.00 o’clock change of charges.
STEP BY STEP SOLUTION
1. Select the first day of production of the month (13.11.2013) in the calendar.
2. Press the Standard-Zoom-Button 24h to show the whole day.
3. Draw up Detail-Zoom frame
(by using the left side of mouse from approx. 9:45 a.m. to 10.15 a.m.)
4. Check the curve progression
5. By using the NEXT button (right hand side to standard zoom button) the data set of the next
recording day (17.11.2013) can be seen
Repeat 4 and 5 until all production days have been checked. If necessary a PDF can be created.
FIG. 17:
EVENT PANEL DETAILS
FIG. 18:
EXAMPLE CALENDAR