5.3.9 Assembling of the Data Cable (Profibus Network)
The connection from the ARE K1 / PFB to the master PLC is made using the interface cable. This
must be mounted in following steps:
• Prepare the SAB cabs "Profibus" in the same way like subchapter 5.3.2 .
• Put all the removed parts ( nut (5), pipe (4), cable fastener (3)) and the cable pipe of the SAB cab
as well (1 to 4) to the cable.
Figure 5-6: Arranged Parts for Mounting
• Remove the outer isolation of the cable at a length of 6 cm.
• Unwrap the texture of the shielding and drill it to build up pig tail wire (7).
• Stick a covering hull to the pig tail wire.
• Put the cable to the cable pipe. The length of the cable coming out the SAB cab must be long
enough to do all further installation steps in an easy way.
• Remove the isolation of the data wires at a length of 6 [mm].
• drill red litz wire of the data cable and put on a covering hull.
• do the same way with the green litz wires.
• Stick the pipe (4) into the cable fastener (3).
• Stick the cable fastener (3) into the cable pipe.
grey
Profibus
nc
+Data ( B )
nc
shield
nc
nc
nc
nc
nc
-Data ( A )
green
red
KHJFG
Figure 5-7: Pin Assignment for the Profibus-Net Data Cable
• Connect the data cables into the right places of the MINI-COMBICON-Connector.
• The pin assignment is shown in the Figure 5-7 at top.
• Continue according to subchapter 5.3.4