Instruction Manual

PIPING
*HBC(X),
*
PHBC(X),
*
RHBC(X),
*
CHBC(X):
Installation, Operation, and
Maintenance
Instructions
8
FIGURE 1.
Determination of Right-Hand/Left-Hand References
FIGURE 2.
Coil Assemblies (Right-Hand Shown)
3 Row
3/1
Row
4/1
3/2 Row