Instruction Manual
*HBC(X),
*
PHBC(X),
*
RHBC(X),
*
CHBC(X):
Installation, Operation, and
Maintenance
Instructions
10
PRE-STARTUP CHECKS
PRE-STARTUP CHECKS
WARNINGS:
•
Electrically ground fan coil. Connect ground wire to ground terminal
marked “GND”. Failure to do so can result in injury or death.
•
Do not touch any rotating component with any object. Damage to the
equipment and personal injury can occur.
CAUTION: Any device such as a fan switch or thermostat that has been furnished by the
factory for field installation must be wired in strict accordance with the wiring
diagram that is supplied with the unit. Failure to do so could result in
damage to components and will void all warranties.
Prior to starting the unit:
1.
Ensure supply voltage matches nameplate data.
2.
Ensure unit is properly grounded.
3.
With power off
, check blower wheel set-screws for tightness and ensure
blower wheels rotate freely and quietly.
4.
Ensure fan coil is properly and securely installed.
5.
Ensure unit is sloped toward drain line.
6.
Ensure unit will be accessible for servicing.
7.
Ensure condensate line is properly sized, run, trapped, pitched and tested.
8.
Ensure all cabinet openings and wiring connections have been sealed.
9.
Ensure a clean filter is in place and of adequate size.
10.
Ensure all access panels are in place and secured.