Operating Instructions
Table Of Contents
- 1. Introduction
- 2. Technical customer support
- 3. Functional description
- 4. Unpacking, transporting, storing
- 5. Technical data – Device
- 6. Technical data – Radio modules (all optional)
- 7. Operation
- 8. General device configuration
- 9. Wi-Fi configuration
- 10. WWAN configuration
- 11. Mechanical installation
- 12. Electrical installation, cable connection, cable cover
- 13. Connectors
- 14. Integrated power supply, power supply cable
- 15. Optional equipment
- 16. Maintenance
- 17. Malfunctions and troubleshooting
- 18. Reasonably foreseeable misuse
- 19. Guidelines and certificates
- 20. End-of-life device disposal
- 21. List of figures
Electrical installation, cable connection, cable cover
106 / 140 DLT-V72 Operating Instructions V2.50 Preliminary
12.3.3. Securing the power supply cable to the strain relief rail
Place one cable clip on the power supply cable.
Secure the cable clip to the strain relief rail using 2 mounting screws
(ISO 4762-M4x10-A2 cylinder-head screws).
Tighten the mounting screws alternatingly!
ATTENTION Tighten the mounting screws sufficiently but on no account pinch or crush the cable.
If you do, the cables may break or the cable insulation may get damaged.
Fig. 12.4: Cable clip secured to the strain relief rail.