User manual
Appendix A 
Design Worksheets 
An organized system configuration will lead to efficient performance and 
reduce engineer effort. This Appendix provides the necessary worksheet, 
helping users to configure their DA&C system in order. Follow these 
working steps to build up your system relational document: 
Step 1: Asking questions and getting answers for your control 
strat- egy. 
1)   What will be monitored and controlled? (List the equipment) 
2)   What will be monitored and controlled separately? (Divide the func- 
tion area) 
3)   What will be monitored and controlled by ADAM-5000/TCP? (List 
the target equipment in different function areas) 
Step 2: Identify the I/O types of each equipment and full-fill Table A-1 
to establish the I/O data base. 
A-2 ADAM-5000/TCP User’s Manual 










