Instructions / Assembly
11
INSTALLATION
Fig 27
Fig 28
Fig 29 Fig 30
www.advaning.com
SOFFIT/CEILING
INSTALLATION
Locate a main struc-
tural support (ex:
stud/truss), straight
at and leveled edge
of your roof, eave or
overhang that is clear
and free of obstruc-
tions.
Using a chalk line or
laser level, mark a line
that runs the entire
length of your aw-
ning. The awning will
stand 10” off of this
line.
Use the recommend-
ed bracket location
chart (page 5) to
determine bracket
locations for your
awning model along
the line.
Place the soft/ceiling
mount side of bracket
in place, use a level
to ensure bracket is
straight and mark the
center of the mount-
ing holes.
Drill mounting holes.
General wood framing
installation
Level
Bracket
3.5”
Roof, eave or overhang
Chalkliner
Minimum 10 inch
clear space
Roof, eave or overhang
Bracket locations base on your awning model
Marker/pencil
1
2
3
4
5
1
2
3
4
5