Instructions / Assembly

8
INSTALLATION
Fig 11
Fig 10
Locate a position that is
Recommended: 8 to 10 ft.
above the ground/oor,
deck etc.
Recommended (for wall
mounts only): Minimum
of 1 inch clearance below
the roof/eave/overhang
etc.
Critical: Minimum of 10
inches clear vertical run
length (no obstructions)
– depending on awning
size.
Run length should be free
and clear of any obstructions
along the entirety of planned
install site.
Personal & specic structural
physicalities may require de-
viation from the recommend-
ed measurements, consult
with a professional installer
who can best assess your in-
stallation site and ensure a
safe and full function of the
awning once installed.
PRE-INSTALLATION
GUIDE
Side view
Ground, oor or deck
Roof, eave or overhang
10 inches clear space
Ground, oor or deck
Front
Bar
B
Minimum 1 inch
Roof, eave or overhang
Recommended
8~10 feet
8 ~ 11 feet projection space
Minimum 1 inch
Minimum 10 inch
clear space
A
Recommended
8~10 feet*
C
A
B
C