Instructions / Assembly
9
INSTALLATION
Fig 20
Follow instructions for
standard installation
step 1 and 2 (page 7).
Use recommended
bracket location
chart (page 5) to nd
bracket location for
your awning model
along the line.
Align the top of the
bracket to the chalk
line and use a level to
make sure the bracket
is straight.
Mark the center of
the bracket mounting
holes.
Drill mounting holes
using a masonry drill
bit.
Fig 18 Fig 19
Fig 17
www.advaning.com Toll Free (US): (855) 574-0158
Wall
3.5”
Bracket
Center
Bracket locations base
on your awning model
3
3
4
4
5
5
2
1
2