Use and Care Manual

6
INSTALLATION
Fig 7
Fig 8
Locate a position that is
Recommended: 8 to 10
ft. above the ground/
oor, deck etc.
Recommended (for
wall mounts only):
Minimum of 1 inch
clearance below the
roof/eave/overhang
etc.
Critical: Minimum of
10 inches clear verti-
cal run length (no ob-
structions) – depend-
ing on awning size.
Run length should be free
and clear of any obstruc-
tions along the entirety
of planned install site.
Personal & specic struc-
tural physicalities may
require deviation from
the recommended mea-
surements, consult with
a professional installer
who can best assess your
installation site and en-
sure a safe and full func-
tion of the awning once
installed.
PRE-INSTALLATION
GUIDE
Side view
www.advaning.com
Ground, oor or deck
Roof, eave or overhang
10 inches clear space
Ground, oor or deck
Front
Bar
B
Minimum 1 inch
Roof, eave or overhang
Recommended
8~10 feet
8 ~ 11 feet projection space
Minimum 1 inch
Minimum 10 inch
clear space
A
Recommended
8~10 feet*
C
A
B
C