Use and Care Manual

4
REQUIRED TOOLS
AWNING TERMINOLOGY AND LOCATION
Fig.5
Fig.4
Arm shoulder
Cassette
Crank loop
Torsion bar
Roller tube
Awning fabric
Front bar
Valance
Powercord
Retractable arms
Easy Pitch
TM
loop
Wall/ceiling bracket
Lag screw
Retaining bolt
REQUIRED TOOLS
Marker / pencil
Measuring tape
Electronic Stud nder
Chalk line / laser level
Level
3/8” socket wrench
*Wood Drill Bit
1/2” Masonry Drill Bit
Power Drill / Hammer
Drill (Masonry)
Ladders (2)
Minimum 2 people to install
Electric model only
www.advaning.com
*Dependent on wood species: 1/4” ~ 9/32” drill bit.
1
1
5
6
3
6
7
2
2
4
5
4
7
8
8
9
10
12
10
10
13
14
3
11
11
1
3
6
7
2
4
5
8
9
10
11
12
13
14
1
5
6
3
7
2
4
8
9
10
9