Use and Care Manual
11
INSTALLATION
Fig 27
Fig 28
Fig 29 Fig 30
SOFFIT/CEILING
INSTALLATION
Locate a main struc-
tural support (ex:
stud/truss), straight
at and leveled edge
of your roof, eave or
overhang that is clear
and free of obstruc-
tions.
Using a chalk line or
laser level, mark a line
that runs the entire
length of your aw-
ning. The awning will
stand 10” off of this
line.
Use the recommend-
ed bracket location
chart (page 5) to de-
termine bracket loca-
tions for your awning
model along the line.
Place the soft/ceiling
mount side of bracket
in place, use a level
to ensure bracket is
straight and mark the
center of the mount-
ing holes.
Drill mounting holes.
www.advaning.com
4
5
General wood framing
installation
Level
Bracket
3.5”
Roof, eave or overhang
Chalkliner
Minimum 10 inch
clear space
Roof, eave or overhang
Bracket locations base on your awning model
Marker/pencil
1
2
3
1
2
3
4
5