Owner's Manual
11
www.advaning.com Toll Free (US): (855) 574-0158
INSTALLATION
Fig 27
Fig 28
Fig 29 Fig 30
NOTE: The awning will
stand 10” off of this line.
Locate a main
structural support (ex:
stud/truss), straight
at and leveled edge
of your roof, eave
or overhang that
is clear and free of
obstructions.
Using a chalk line
or laser level, mark
a line that runs the
entire length of your
awning.
Use the recommend-
ed bracket location
chart (page 5) to de-
termine bracket loca-
tions for your awning
model along the line.
Place the ceiling
brackets in the
appropriate locations.
Use a level to make
sure the bracket is
straight and mark
the center of the
mounting holes.
Drill mounting holes
using a drill bit.
INSTALLING
CEILING
BRACKETS
Level
Bracket
3.5”
Roof, eave or overhang
Chalkliner
Minimum 10 inch
clear space
Roof, eave or overhang
Bracket locations base on your awning model
Marker/pencil
1
2
3
4
5
1
2
3
4
5