Installation Guide
11
www.advaning.com  Toll Free (US): (855) 574-0158
INSTALLATION
Fig 27
Fig 28
Fig 29 Fig 30
NOTE: The awning will 
stand 10” off of this line.
Locate a straight, 
at and leveled edge 
of your roof, eave 
or overhang that 
is clear and free of 
obstructions.
Using a chalk line 
or laser level, mark 
a line that runs the 
entire length of your 
awning.
Use the recommended 
bracket location chart 
(page 5) to determine 
bracket locations for 
your awning model 
along the line.
Place the ceiling 
brackets in the 
appropriate locations. 
Use a level to make 
sure the bracket is 
straight and mark 
the center of the 
mounting holes.
Drill mounting holes 
using a drill bit.
INSTALLING 
CEILING 
BRACKETS
Level
Bracket
3.5”
Roof, eave or overhang
Chalkliner
Minimum 10 inch 
clear space
Roof, eave or overhang
Bracket locations base on your awning model
Marker/pencil
1
2
3
4
5
1
2
3
4
5










