Installation Guide
5
INSTALLATION
Fig 6
Fig 7
Side view
Locate a position that is:
Minimum 2 inch of 
clearance below the 
roof/eave/overhang.
At least 10 inch of ver-
tical clear space.
Minimum depth of  
31 inches.
The Door Awning needs 
to be mounted to the 
main structural supports 
of the building.
The surface of the area 
should be clear of any 
obstructions along the 
entirety of the Door 
Awning.
DETERMINE THE 
DOOR AWNING 
LOCATION
www.advaning.com  Toll Free (US): (855) 574-0158
Roof, eave or overhang
Roof, eave or overhang
31 inches
Minimum 2 inch
Ground, oor or deck
Minimum 10 inch 
clear space
B
Minimum 10 inch clear space
A
Minimum 2 inch
A
B
C
C










