Instruction Manual

INSTALLATION
Pre-Plan your installation. You need to accomplish the following:
Meet all National and Local codes (NEC
®
Article 285 and UL 1449 address SPDs).
Conrm System voltage to SPD voltage (120V SPD will fail instantly on 240V, 277V, etc.).
Mount SPD as close to panel or equipment as possible to keep leads short.
(long leads hurt performance).
Ensure leads are as short and straight as possible, including neutral and ground. If using a
breaker, use a breaker position that is close to the SPD and the panel’s neutral and ground.
If using a breaker, recommended breaker size is 30A due to 10 AWG conductor.
Make sure system is grounded per NEC
®
and clear of faults before energizing SPD.
(inadvertent system problem may fail SPD).
Never Hi-Pot test Any SPD. (will prematurely fail SPD).
Do not install the XCS through the bottom of a NEMA 3R panel. Dripping water will
prematurely fail the SPD.
1. Use voltmeter to check voltages and ensure correct SPD. See Data Sheet for specs and wire-outs.
2. Determine Mounting location – weather resistant equipment may be required.
3. If SPD has optional Dry Contact Flush Mount Kit, or Remote Indicator, pre-plan their installation. See
Figure 3. (If ush mounting, be careful to not drop SPD into wall).
4. Remove power from panel/source. Conrm panel/source is deenergized.
5. Identify breaker location and SPD location. Position SPD such that LEDs are best visible.
6. Mount SPD – weather resistant applications require additional sealing, etc. (not included)
- Remove an appropriately sized knockout from panel.
- Connect conductors as appropriate – short and straight as possible (Hi-Legs are Phase B).
- Note that the metallic connection hub is not grounded within the SPD and proper grounding
requires connection of the green conductor ground.
7. Label or mark conductors as appropriate (neutral: white, ground: green, energized: black, hi-leg: orange).
8. Make sure system is bonded per NEC
®
and is clear of hazards or faults before energizing
(N-G bonding not per NEC
®
will fail SPDs: #1 cause of SPD failures).
9. Energize and conrm proper operation of green LED indicators and/or options.
2
Figure 2
A
BC
GN
BREAKER
Figure 1
(Type 1 or individual equipment installations may vary)
Use closest breaker
to SPD
Locate SPD close to
intended breaker
Keep Leads Short
as Possible
Avoid Sharp Bends
Rotate XCS such
that LED indicator is
most visible
Outdoor installation requires appropriate weather
sealing at nipple (gasket, sealing conduit, etc.)
To Protected Loads
LEADS SHORT & STRAIGHT
Cut off
Excess
Length
Do Not
Loop or
Coil
Short and
Straight
Figure 3
Phase, Ground,
and Neutral Wires
SPD
Mounting
Screws
(4 places, through mountingplate into
mounting surface, screws not provided)
Flush Mount
Kit Screws
(8-32 x 5/8” Thread Cutting, 4
places, through plate into SPD)
Mounting Surface
Removed Material
Flush Mount Plate
Insert ushmount screw
through hole in each
corner or punch a small
starting hole in center of
each translucent window
(located in all 4 corners
of the label).
VERIFY THAT ALL POWER CIRCUITS ARE
DEENERGIZED BEFORE MAKING CONNECTIONS
All electrical connections should be performed by a qualied (licensed)
electrician or technician. All wiring must comply with the National
Electrical Code (NEC
®
) and applicable local codes.
V
WARNING
Conrm XO N-G Bonding at Upstream Transformer
Do Not Hi-Pot Test
Resulting Damage is not Covered Under Warranty
TYPICAL PANEL
INSTALLATION
X
NOT
GOOD
GOOD
V
WARNING