Specifications

61200624L1-1A © 2002 ADTRAN, Inc. 359
LOGGING IN TO THE SYSTEM
Introduction
Once connected to the unit via either a VT100 terminal or PC configured as a VT100 terminal, it is
necessary to log in to the system to gain access to the management and provisioning functions. This DLP
provides specific steps for logging in to the system and accessing the various management and
provisioning functions.
Prerequisite Procedures
Complete DLP-001, Connecting the Terminal or PC to the CRAFT Port, before logging in to a unit.
Tools and Materials Required
VT100 compatible terminal or computer with terminal emulation software
Appropriate cable to connect terminal to the unit (customer-provided)
DB-9 female to RJ-45 female adapter (customer-provided) for connecting to the
CRAFT port on the rear
of the unit. This adapter is ADTRAN-proprietary.
To prevent electrical shock, do not install equipment in a wet location or during a
lightning storm.
In this DLP, unit refers to the Total Access 604, 608, 612, 616, and 624.