Installation guide
Product Overview NetVanta 2000 Series Hardware Installation Guide
22 © 2004 ADTRAN, Inc. 61202361L2-34B
Reviewing the Unit Rear Panel Designs
The NetVanta 2050 and NetVanta 2100 rear panels contain two Ethernet ports, a DB-9 serial connection,
and a power connection (see Figure 6).
Figure 6. NetVanta 2050 and NetVanta 2100 Rear Panel Layout
VPN STAT
(2050/2054/2100)
VPN STATUS
(2300/2400)
Red (slow flashing) Phase 1 IKE VPN negotiation has failed.
Red (fast flashing) Phase 2 IKE VPN negotiation has failed.
Amber (fast flashing) Phase 2 IKE VPN negotiation is in progress.
Amber and Green
(alternating slow flash)
there is an active tunnel and an additional
IKE Phase 1 VPN negotiation is in progress.
Green (solid) Phase 2 IKE VPN negotiation has completed
successfully.
VPN TD/RD Green VPN data is being transmitted/received by the unit.
PUB TD/RD Green data is being transmitted/received on the public
interface.
PUB LNK
(2300/2400)
Green (solid) the 10BaseT Ethernet link is up.
Amber (solid) the 100BaseT Ethernet link is up.
*PRIV TD/RD Green data is being transmitted/received on the private
interface.
*PRIV LNK
(2300/2400)
Green (solid) the 10BaseT Ethernet link is up.
Amber (solid) the 100BaseT Ethernet link is up.
*Note: The NetVanta 2300 and NetVanta 2400 have multiple private ports. These ports are labeled
PRIV 1, PRIV 2, and PRIV 3.
Table 2. NetVanta 2000 Series LEDs (Continued)
For these LEDs... This activity... Indicates that...