Instruction Manual
Table Of Contents

Industrial PCs MCR5000
24
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
4.2 CABLE INSTALLATION
1) Install all required cables and leads. Make sure that the cables are secured against
slipping off.
2) Connect the MCR 5000 device with a power source by using the "AC in" socket. If
you'd like to supply a monitor or any other component with power as well, you could
do this by connecting the component to the "AC out" socket at the MCR 5000.
3) Verify that all cables and leads are correctly installed.
4) The power supply is enabled by pushing the Power button (1.). Subsequently turn the
device on by using the ATX button (2.).
4.3 READINESS FOR OPERATION CHECKS
Accurately check the unit for any hidden damages possibly incurred during improper
transport and/or handling or wrong operation site and/or storage conditions (e.g. smoke
emissions or formation by the unit, etc.). If any damages are found, the unit must be
decommissioned or scrapped. Ensure that it is safe from accidental re-implementation.
4.4 STATUS DISPLAYS
SYS LED (BICOLOURED)
Depending on the colour and type of flashing different device states are displayed by the
SYS LED.
The following signals are displayed:
• LED lights green The device is ready for operation. (Power ON)
• LED is off The device is switched off. (Power OFF)