Instruction Manual

ADS XiLog+ System User Manual
13
C H A P T E R 2
Deploying the XiLog+
Deploying an ADS XiLog+ logger typically involves the involves the
following steps:
1. Programming the XiLog+
2. Performing a Signal Strength Test
3. Installing the XiLog+ at the Location
Deploy XiLog+ data loggers in a similar manner to other comparable units.
However, consider the following factors concerning GSM capabilities and
requirements during deployment:
Mount the logger in an upright position, not at an angle or on its side.
When installing the logger underground, mount the logger as close as
possible to ground level, preferably within 6 inches of the surface.
Following these guidelines will help ensure the GSM functions most
effectively. This chapter provides detailed instructions for each step in the
deployment process.