User Manual
3-26 ADS FlowShark IS Manual
Performing a special installation involves the following process:
Gathering the parts and supplies
Gathering the tools and equipment
Mounting the ultrasonic depth sensor
Mounting the Doppler velocity sensor
Mounting the pressure depth sensor
Securing the cables to the band
Before beginning the installation, conduct a thorough investigation
of hydraulic and other site conditions. The hydraulics of a site
directly affect the monitor's ability to accurately measure flow depth
and velocity. In addition, measure the horizontal and vertical pipe
dimensions carefully. Even slightly inaccurate pipe dimensions can
significantly skew and misrepresent flow data.
Caution: Handle all sensors and cables with extreme
care. The sensors and cables contain delicate mechanisms
and electronics. Keep sharp objects away from sensor
cables, and avoid stepping or placing heavy objects on the
cable during installation.
Gathering Parts and Supplies
Be sure to obtain the following supplies before performing a special
installation to prevent any costly delays. When ordering, specify the
FlowShark IS flow monitor special installation hardware.
Quantity Description ADS Part Number
1 FlowShark IS flow monit or (i ncludes internal
battery)
5000–IS1–US–01
1
1 monitor mount i ng bracket I40–0003
1 IS ultrasonic depth sensor 106186A–30 (ft)
as needed IS ultrasonic depth sensor extension cable 106137A–xxx
2










