User Manual

7-4 ADS TRITON+ Manual
Mounting t he M onitor to the Manhole
Wall
If the proj e c t will involve measuring flow over a long period of
time, consider mounting the monitor permanently to the manhol e
wall. Using a monitor mounting bracket/ fl ange (ADS p/n I40-
0009), you can hang the monitor more securely and out of the way
to allow use of the rungs.
Mount t he monitor handle to the manhole wall as follows:
1. Determine the appropriate location to mount the monitor
handle to the manhole wall. Consid er the following when
selecting the proper location:
Select a location that will allo w you to remove the monitor
easil y during service visit s us ing the mounting b racket
(extension handle).
Select a location that provides only a minimal potential for
the monitor to experience surcharge conditions.
Select a location that will prevent the manhole lid from
potentially damaging the monitor during removal o r when
rot ating in the opening.
Select a location that will allo w personnel to enter /e xit the
manhole without removing monitor.
2. Hold the to p end of the mounting b racket against the manhole
wall, and mark the location for the mounting hole t hrough the
keyhole in the bracket.
3. Drill a hole approximately 3 inches (75 mm) deep at the mark,
and install a 3/8-inch x 3-inch. (10-mm x 75-mm) anchor bolt
in the hole.
Note: Make sure all anchor bolts, studs, nut s , and
washers used in mounting the monitor are stainless steel.