Installation Guide
Our product is designed to allow natural movement that
protects from freezing, thawing, and settling.
If you use adhesive on the ADORN® panels, only place in the
noted area to allow for drainage.
Maintain a 2” clearance from hard surfaces such as pavement
and patio surfaces to prevent damage during freeze/thaw
temperatures.
FREEZE THAW INFORMATION
Ensure that ADORN® is being installed to a structure that meets all building code requirements. Code-approved flashing
must be used at all terminations, penetrations, and material transitions. Control moisture penetration caused by runoff,
gutters, and downspouts. If there is any question as to the integrity of the structure, contact the appropriate professional
to correct it. ADORN® should maintain a 2” clearance from hard surfaces such as pavement and patio surfaces.
When cutting, grinding, or trimming any ADORN® pieces, always follow the tool manufacturer’s safety instructions and use
the appropriate safety protection.
Cutting dust and general construction dust can be removed with clean water and if needed, a nylon bristle brush. Do not
clean with a power washer, harsh chemicals, or acid products.
The small side of the corner occasionally may not fit as snug as desired. If needed, a dab of construction adhesive can be
applied to the back of the piece to ensure a snug fit.
The corners are manually checked to fit together and are packaged as a set. There are 4 sets placed in the box together
and the remaining 2 sets have the 5.5” pieces at one end of the box with the 2 9.5” pieces lying flat on the top. When
installing corners, use the sets as they are shipped.
See our website for Warranty & Care Information - www.adornstone.com/resources
ADORN® / Rust-Oleum coordinating colors to touch up the base color:
Colorado Gray - #249279 Primer Gray Desert Tan - #7772 Putty
Northern Gray - #249279 Primer Gray Terra - #249857 Satin London Gray
Buckskin - #7226 Bronze Slate & Limestone - #249279 Primer Gray
To finish projects where ADORN® is to be installed up to the soffit,
measure the distance from the last full panel installed to the soffit.
Cut ADORN® panels to fit and glue into place using construction
adhesives, such as PL Premium or Dap DynaGrip.
You may need to trim the attaching flange from the last full panel
or securely attach a nonpainted, clean flashing material to the
structure to achieve a good bond surface.
IMPORTANT INFORMATION
Installing to the Soffit
During the installation, some panels will need to be cut to fit and the attaching flange will need to be removed.
To remove the flange, carefully cut off with snips.
This may produce sharp edges so handle with care.
Pieces without the attaching flange will need to be installed with adhesive. In order to achieve a good bond, a non-
painted, clean flashing material must be attached to the structure first. After the bonding surface has been installed,
use a heavy-duty construction adhesive such as PL Premium or DAP DynaGrip Max to install the ADORN® pieces.
Additional temporary support may be needed until adhesive cures.
Removing the Attaching Flange




