Operation Manual
12
Workspace
Last updated 11/30/2015
You can also open the Desktop view, navigate to the folder that contains the ircp file that you want to load, and
double-click the file thumbnail.
Save a project
SpeedGrade saves the status of your work every 5 seconds. However, saving the current project from time to time is
recommended. Multiple saves are useful for reverting to a previous version you liked better.
?
Press Ctrl+S (Windows) or Cmd+S (Macintosh).
You can also click the Save SpeedGrade Project button in the toolbar on the upper-left corner of the workspace.
You can also click the Save IRCP button on the Timeline panel.
Autosave option is now available, both in Direct Link and in native SpeedGrade mode. This option is available
under References. Maximum number of versions allowed is 10.
Work on multiple projects at the same time
1 Press Ctrl+O (Windows) or Cmd+O (Macintosh) and open the first project.
2 Use the Media browser view to navigate to the folder that contains the ircp file of the second project that you want
to open at the same time.
3 Click the Plus (+) icon on the file's thumbnail.
SpeedGrade opens the second project on a second Timeline. Opening multiple timelines enables split-screen playback.