User`s manual

12 Introduction
1.5 Unpacking Checklist
Check the shipping carton for any damage. If the shipping carton
and contents are damaged, notify the dealer for a replacement.
Retain the shipping carton and packing materials for inspection by
the dealer. Obtain authorization before returning any product to
ADLINK.
Check that the following items are included in the package, if there
are any items missing, please contact your dealer.
SBC:
X The cPCI-6841 or cPCI-6841-2 SBC (May be equipped with
different specifications of CPU, RAM, and HDD)
X This User’s Manual
X ADLINK All-in-One CD
X Y Cable for Keyboard and Mouse
Note: The packaging of OEM versions with non-standard
configuration, functionality, or package may vary
according to different configuration requests.
CAUTION: The boards must be protected from static discharge
and physical shock. Never remove any of the socketed
parts except at a static-free workstation. Use the anti-
static bag shipped with the product to handle the
board. Wear a grounded wrist strap when servicing